Heydar Aliyev drilling Rig

The Heydar Aliyev drilling rig operated by Maersk Drilling arrived at the BOS Shelf yard in September 2013 with a 75 day scheduled program for the yard stay. The rig departed from the BOS Shelf quay on the 24th January.

Back to projects