FABRICATION

  • 8 covered bays for full indoor completion for unit up to 192m x 36m x 21,9m
  • Overhead Cranes up to 90te capacity up to 180te per bay.

PAINTING

  • 3 permanent painting workshop and in-house contractor, plus there is capacity for temporary workshops.
  • Offshore painting systems including Thermal Sprayed Aluminum (TSA)

PIPING

  • 2 piping workshops (1 exotic + 1 carbon steel)
  • Procedures for: Inconel Clad Carbon Steel, Super Duplex Stainless Steel, Stainless Steel, CuNiFer, Low Temp Carbon Steel, Chrome Molybdenum

LOAD OUT

  • 25 Crawler & Mobile Cranes with up to 1350te lifting capacity.
  • Overall capacity up to 10,000te
  • 3 x 100 m reinforced offloading area (50te/m²up to 10,000te on SPMT)
  • 6 Loading slots with 28m Span associated to STB1 Launch Barge.

TRACK RECORD

  • DWG SUBSEA WI PROJECT (2012/13)
  • WATER INJECTION MANIFOLD SPLITTERS
  • #1 (H02 & H03)
  • # 2 (H05 & H06)
  • RIGID JUMPER SPOOLS
  • H01, H02, H03, H04, H05, H06

DWG SUBSEA WI PROJECT (2014/15)

  • WATER INJECTION MANIFOLD SPLITTER
  • #2 (H07 & H08)
  • RIGID JUMPER SPOOLS
  • H07, H08

DWG SUBSEA WI PROJECT (2015/16)

  • Water Injection Manifold Splitters
  • #3 (F05 & F07)
  • #4 (G05 & G06)
  • #5 (G07)
  • RIGID JUMPER SPOOLS
  • F05, F07, G05, G06, G07