ROLLING

  • 8 automated machines with capacity up to 150mm thickness and up to 4000-4500 mm internal diameter.
  • 22 SAW welding booms and 9 Mobile Semi-Automatic Welding Machines.
  • 16 Overhead cranes up to 50te capacity.
  • Monthly output: 2,500te on a single shift basis.

FABRICATION

  • 14 covered structural bays.
  • Overhead Cranes up to 90te capacity.
  • 3 Computer Assisted Profiling Machines Muller RB 1200 being the largest.

ERECTION

  • 550,000 m² of erection area.
  • 25 Crawler & Mobile Cranes with up to 1350te lifting capacity.
  • 4 Skidways with a bearing capacity from 85te/lm up to 350te/lm.
  • Overall capacity over 1000te

LOAD OUT

  • 1500 m refurbished quay with 2 x 100 m reinforced offloading area (50te/m2)
  • Dedicated Push-Pull System capable of moving structure up to 30,000te.
  • Direct sea access from a sheltered harbour.

TRACK RECORD

  • ACG PROJECT PHASE 1 : CA JACKET (14,130te, 143.3m) CWP JACKET (12,043te, 143.3m)
  • ACG PROJECT PHASE 2 : WA JACKET (13,800te, 133.9m) EA JACKET (15,750te, 166.9m)
  • ACG PROJECT PHASE 3 : DUQ JACKET (15,900te, 185m) PCWU JACKET (15,600te, 185.m)
  • COP PROJECT: COP JACKET (18,200 te, 196 m)
  • SD2 PROJECT: PR JACKET (13,718te, 107.6m) QU JACKET (12,675te, 107.6m)